Guide post mounting method:
1. Installation of guide post guide sleeve
The mounting hole of the guide bushing of the hole processing guide should be processed by a boring machine or a coordinate grinding machine after the other holes are completely processed and the machining stress (re-grinding, etc.) is eliminated. To determine the datum of the upper and lower dies, a temporary locating hole can be machined and then positioned with the reference bar.
2. Guide column installation
The mounting hole thickness is cleaned, the guide post is fixed, and a plurality of ball guide column assemblies are used, and the reference surface of one of the plurality of guide columns is shifted by 90 degrees. Prevents mold frame assembly errors. Confirm the verticality of the guide post.
3. Guide bushing installation
Insert the guide post into the guide sleeve. Place the parallel block on the lower mold base and install the upper mold base. Slide the guide bush to confirm interference. The grease and dirt on the bonding surface are washed with a solvent, and an anaerobic adhesive is poured into the bonding groove of the guide bush, and then inserted into the mounting hole. Please cure the adhesive to prevent the guide sleeve from popping out of the upper mold base. (3-6 hours at normal temperature)https://www.xhychromerod.com/